Brahma Group Inc.

EG&G

Stockton, UT

BGI installed three 35-ton sulfur-impregnated carbon filter units with associated equipment that will be used to capture mercury in the flue gas. BGI's scope of this project included:

  • Demolition and removal of existing foundations and asphalt paving.
  • Relocating existing storm, water, and electrical utilities.
  • Installing new 4160V utility power lines, and step-down transformer.
  • Placing new footings, foundations, piers, embedment's, stub walls, transformer pad, equipment pedestals, final concrete slabs and asphalt paving.
  • Structural Steel Fabrication and Erection; Red-Iron connecting building, pre-manufactured main and electrical buildings, and associated pipe racks.
  • Siding and Roofing; All siding, roofing and insulation.
  • Installed 5-ton overhead bridge crane.
  • Electrical and Instrumentation; 4160v feeder and transformer, MCC equipment, generator, load bank, neutral grounding resistor, UPS, temperature transmitters, level indicator/transmitters, level switches, PLC's with I/O's.
  • Install Lightening and grounding grid systems along with communication and fire protection.
  • Fabricate and install large bore Flue Gas ducting.
  • Mechanical Installation; Three each 35 ton Filters, Pumps, Tanks.
  • Install small bore Process Water, Instrument Air, Plant Air, Natural Gas, and Condensate piping.
  • Install HVAC equipment for sub-contractor.
  • Pre-commissioning, commissioning and turn-over of all systems, this includes all testing, validation, and documentation.

Click thumbnails to view images